The mystic Kariba dam


The dam is shared between two states: Zimbabwe and Zambia
      Constructed between 1955 and 1959 – costing $480 000 million
      Total capacity is 180 km3
      Maximum length is 280 km
      Maximum water depth: 97 m
      86 men lost their lives during construction
      57 000 Tonga people were resettled during construction
      Operation Noah between 1958-1961 relocated 6 000 big animals to safety
      130 000 people were evacuated during Operation Noah  
      Nyami Nyami is a name give to the river god associated with the lake. CheekyCliks  